The rotary kiln specific installation steps

The rotary kiln specific installation steps are as follows:

1) Construction preparation in a cement kiln. To make sure the smooth of installation, the buyer should check the equipment according to a blueprint, revise the sub-quality product, remove sundries then build a hanger and delivery it from storage. The outbound sequence should be anchor bolt, wheelset, kiln hood, cylinder, wheel, retaining wheel, spring plate, large gear, gear cover, gear, reducer, engine, auxiliary drive, smoke chamber,  kiln head hood, kiln tail, sealing device, burner, unloading device and other accessories.

17.jpg

2) Lifting and aligning in a cement kiln. The order of lifting and aligning is steel base first, kiln second.

3) Soldering in a cement kiln. A cement kiln generally uses manual welding and automatic submerged arc welding, followed with a soldering –quality check. Then kiln hood, sealing device, cooling system, and the lubricating system should be installed. Then proceed with the basic secondary grouting. Finally, the no-load debugging and test run should be implemented.

4) Laying masonry refractory in a cement kiln. After the success of the no-load test run, to guarantee the rigidity and intensity of cement rotary kiln, different types of refractory bricks should be laid inside the kiln. So it can keep kiln from burning down by high temperature or wearing and tearing by material flow.