Industrial waste slag treatment equipment – Great Wall Machinery Co., Ltd

Industrial waste slag treatment equipment – Great Wall Machinery Co., Ltd

01 waste slag treatment – the trend of the times

According to the statistics, during the recent ten years, the cement industries of the world cement powers like German and Switzerland show the truth that: cement strength is increasing, and clinker consumption is declining. In future, these cement powers will replace traditional Portland cement with type II cement which mix large amount of slag and small amount of clinker.

Great Wall Machinery, the first vertical mill grinding integrated system, can steel slag, slag, nickel slag, manganese residue and other waste residue for processing, has been in the world to build more than 100 residue production line.

 

02 Introduction for advanced industrial waste slag grinding process

 

 

 

 

Slag production processes

Advanced grinding equipment

  1. Integrate the functions of crushing, drying, grinding, separating and conveying. It occupies small area and can be arranged outdoors, that makes investment costs decrease.
  2. It is equipped with PLC/DCS auto control system to realize the remote control.
  3. Fineness of finished product can be regulated with 400~550㎡/kg to meet various requirements.
  4. It has a low power consumption not more than 42Kwh/t.
  5. Equipment system is in the negative pressure state, with low noise, non-dust leakage, keeping the surroundings clean.
  6. Equipment system operates stably.
  7. Original spare parts reduce your worries.
  8. Metal recovery benefits from slag is high.
Advanced technology
Introduce German Loesche vertical mill technology to optimize the working mechanism of grinding roller and grinding table.
A number of vertical mill technologies obtain the certificate of utility model issued by the State Intellectual Property Office.
The whole system operates stably with low electric power consumption not more than 20%.
 
Short delivery time
Possess the ability of large-scaled machining and casting, and ensure the construction period can be shortened to 6-8 months giving priority to the quality.
 
Many customer cases
 At present, Great-Wall vertical mill grinding integrated system has been applied in hundreds of industrial waste slag production lines of Shanghai Baosteel Group, Aosen steel Group,
Growth Steel Group and so on, receiving a good market response.
 
Classic cases:
At present, Great Wall Machinery has established good connections with many famous enterprises like Shanghai Baosteel Group, Aosen steel Group, and Indonesia Growth Steel Group,
and has built hundreds of slag / Nickel slag powder production lines.
 

1.5-million-ton-per-year composite powder production line (2×600,000 tons of slag, 300,000 tons of steel slag), for Shanghai Baosteel Group

 

600,000-ton-per-year slag power production line, for Hebei Aosen steel Group

 

1-million-ton-per-year slag powder production line, for Henan Mengdian Group

 

Two 300,000-ton-per-year Nickel slag powder production lines, for Henan Xuchang Tengxin Co., Ltd

 

300,000-ton-per-year Nickel slag powder production line, for Indonesia Growth Steel Group

 

300,000-ton-per-year steel slag production line, for Xuzhou Dongnan Steel Industry Co., Ltd

 

600,000-ton-per-year slag powder model production line, for Great Wall Machinery Co., Ltd

 

Great Wall has the first and the only presently 600,000-ton-per-year slag powder model production line, and it has rich operation and management experience, so that Great Wall can provide customers with face-to-face online training.
Great Wall Machineryintegrates supply chain resources to put forward the EPC service “one vertical mill, eight services” for slag powder production line, providing all-round services from the establishment stage of project to the operation stage.

 

 

 

Scientific process