The main equipment list for 300 tpd cement plant solutions


Cement production line includes crushing and pre-homogenization, raw material preparation & homogenization, preheating & decomposition, cement clinker sintering, cement grinding and packaging etc. CHAENG have the ability to built 300t / d ~ 5000 t /d cement production line independently, And has extensive experience in the design and construction, built many large cement production line

Configuration

 
 
 
 
1) Model: Ф2.4×8m
2) Max. feed size: ≤25mm
3) Moisture of finished product: 0.5~1.0%
4) Max moisture of material: 5%
5) Fineness of finished product: 80μmR10~12%
6) Capacity: 30t/h
7) Installed Power:570kw
 
 
Preheater
 
Preheater:
C1: Ф2570mm
C2 : Ф2770mm
C3 : Ф2770mm
C4: Ф2940mm
Capacity: 300t/d
 
Preheater Fan
1) Type: W6-29No 21.4D
2) Capacity: 100000m3/h
3) Pressure: 7200Pa
4) Power:400kW
 
 
1) Model: Ф2.8 X 44m
2) kiln pitch: 3.5%
3) rotary speed: 0.375-3.3r/min
4) Capacity: 330t/d
5) Motor Power:90kw
 
Clinker Cooler
1)Type :Ф2.5 X25m
2)Capacity:300t/d
3)Clinker temperature at outlet : ≤100℃
 
 
1) Model: Ф2.4 X 8m
2) Max. feed size: ≤25mm
3) Fineness of finished cement: 3200cm²/g
4) Capacity: 30t/h
5) Installed Power: 570kw
 
Packing machine
1)  Type:   4RSE
2)  Capacity:60 t/h
3)  Accuracy:±150g deviation as average of 10
 
1) Model: Ф2.2 X 4.4m
2) Max. feed size: ≤25mm
3) Capacity: 8t/h
4) Installed Power: 250kw

300t/d cement production line designed by Great Wall machinery, fully learns from the lessons and experiences of more than 30 years of NSP production line design, advanced vertical roller mill grinding system and DCS automatic control system.