Shanghai Baosteel Ningbo Ziheng’s 1500000t/a composite powder production line

 Overview

Project introduction: In 2013, In order to study the cyclic utilization of steel slag, slag and exhaust gas in steel plants and achieve zero emission in steel plants, Shanghai Baosteel wanted to make a national demonstrative project in slag power’s quality, production technology, park construction and other aspects, and after a lot of research, it chose Xinxiang Great Wall Machinery as the EPC construction unit.

After this project went into operation, all equipment runs stably, all operation indexes are good, and the output of slag powder can reach over 110t/h with the specific surface area of 430m²/kg; the output of the steel slag powder is 53t/h with the specific surface area of 500 m²/kg, and this project fully meet the designed requirements.

This project successfully realizes the strategic target of zero emission of steel slag powder in Chinese steel and iron industry, and becomes the good example for all steel plants in China which want to produce high-quality products in a high-efficient, low-consumption and environmental way.

 

 1500000t/a composite powder production line

Production time: April 2017

Main equipment configuration: GRMS46.41 slag vertical roller mill, 3.2×13m steel slag ball mill + 14080-D roller press

Raw material: slag, steel slag

Capacity: capacity of slag powder is 110t/h; capacity of steel slag powder is 50t/h

Fineness of the finished product: the specific surface area of the slag powder is 430m²/kg; the specific surface area of the steel slag powder is 480m²/kg

Application: cement, concrete etc.

Shanghai Baosteel Ningbo Ziheng’s 1500000t/a composite powder production line

Service & Surport

Founded in 1958 and located in Xinxiang, Henan province, CHAENG has 60-year experience in equipment manufacturing with an area of 330,000 m2 and 1 billion RMB of annual production value. The company is specialized in manufacturing all kinds of ball mills, rotary kilns, vertical mills, large steel castings. And we can undertake the EPC projects of cement production line, quick lime production line, blast furnace slag/ steel slag/ nickel slag grinding plants. Its products are sold to more than 50 countries and regions in Southeast Asia, Central Asia, South Asia, North America, South America and Europe.

Our long-term strategic partners: Arcelor Mittal, Tata Group, Pohang Iron and Steel Company, Germany CCE, Japan Chiba , Shanghai Baosteel,Voestalpine and ASGT, etc.