Overview
Chaeng can supply turnkey basis service for cement plant with capacity of 700 tons per day. It is composed of engineering, manufacturing, procurement, installation, debugging, commission and staff training, etc. The design of 700t/d new suspension preheater dry process cement production line uses the most advanced five-stage suspension preheater, RSP/F decomposing furnace and cement rotary kiln. The centralized control technology will be also used in computer automation system. We are committed to offer you a perfect cement plant solution with advanced process technology and excellent facilities. All technological indexes are approvable in your local industry criteria.
Features
1. Limestone Homogenization Silo: Simple Device, Economy, Little Floor Space
Considering the fact that difference exists in the ingredient content of limestone, which makes the quality index difficult to control, the design uses the effective small-scale cross cut type raw material prehomogenization storage (that is, vertical prehomogenization storage) to narrow standard deviation. The homogenizing of the prehomogenization storage is 3~ 6 and discharges Ca-CO. The standard deviation being about 1.5%~2.0%. It is especially fit for small dry-process cement manufacturing plant whose capacity is 700t/d.
2. Low Power Consumption in Raw Material Homogenizing System
Considering limited spaces in the project site, we are going to engineer a φ15 ×35m MF homogenizing silo used to homogenize. Its effect volume is 5500t. The silo is made by the principle of gravity, so the power consumption is as low as 0.4-0.6kWh/t.
3. Convenient Feeding System
There are 2 sets of mechanical feed weight scales installed at the bottom of silos. Pulverized coal is fed into the kiln head and decomposing furnace by rotary feeding device. The safe feeding system is easy to control and runs perfectly.
4. Cyclone System
In the design, the single row layout five-stage suspension preheater is used. Except for tube C1, others are all low-pressure cyclones. Near feed points of cyclones air ducts, there are adjustable discharging boards installed to help the material scattering, preventing the material from clustering drop and causing short circuit.
5. Best in Class RSP/F Decomposing Furnace
RSP/F decomposing furnace is developed on the basis of RSP technology, absorbing the advantages of MFC furnace and adding the fluidized bed. It is composed of pre-combustion chamber, calcining chamber and mixing chamber. RSP/F extends the standing time of pulverized coal and material. Due to the volume of SC and MC is enlarged properly, and fluidized bed is added, standing time of pulverized coal and material is extended to around 3.6s. The dispersiveness of material is intensified and it also enlarges the heat transfer area of whole system.
6. Anti-blocking Measure of Preheating System
To prevent crusting and blocking problem, poking holes as well as air cannon are engineered in the flowsheet; tricyclic compressed air purge system are installed in the C4-C5;there is bicyclic compressed air purge system in C1-C2. To know the condition of preheater timely, there is also manometer to monitor the working condition of cyclone. When the cementation blocking occurs, the monitoring device will release alarm signal such as light or sound, and the operators can deal with it directly.
7. Large Kiln Hood
It can increase the temperature of tertiary air effectively and makes the layout of tertiary air duct simple.